Thursday, January 30, 2014

A123 Energy Solutions to install 2.8MWh of grid storage at Japanese factory

#Energy Lithium-ion battery maker and developer A123 Energy Solutions has been awarded a contract to install a 1MW, 2.8MWh grid storage solution (GSS) to help integrate a PV array at a Japanese factory.http://ift.tt/1jMZosZ http://bit.ly/15KdByZ

No comments:

Post a Comment